Last edited by Mazular
Sunday, February 9, 2020 | History

2 edition of Preliminary environmental assessment for the satellite power system (SPS). found in the catalog.

Preliminary environmental assessment for the satellite power system (SPS).

United States. Satellite Power System Project Office.

Preliminary environmental assessment for the satellite power system (SPS).

  • 371 Want to read
  • 34 Currently reading

Published by Dept. of Energy, Office of Energy Research, Satellite Power System Project Office, for sale by the National Technical Information Service in Washington, Springfield, Va .
Written in English

    Subjects:
  • Satellite solar power stations -- Environmental aspects.,
  • Satellite solar power stations.,
  • Solar power plants -- Environmental aspects.

  • Edition Notes

    SeriesDOE/ER -- 0036/1., DOE/ER -- 0036/2.
    The Physical Object
    Pagination2 v. :
    ID Numbers
    Open LibraryOL17820314M

    Archer, S. With very large scale implementations, especially at lower altitudes, it potentially can reduce incoming solar radiation reaching earth's surface. Alternatively it may be based on site-specific information. The instrument teams must work with the main satellite design team to ensure instruments are the right mass, fit correctly and sustain environmental testing. Lee, P.

    Ideally this will be before a development proposal is fully defined. Prasad, A. The information sent back from its radiation detector led to the discovery of the Earth's Van Allen radiation belts. Responsibility for the final content of this report rests entirely with the authoring committee and the institution.

    Business models, financing, and energy costs Burt, M. Orbital location[ edit ] The main advantage of locating a space power station in geostationary orbit is that the antenna geometry stays constant, and so keeping the antennas lined up is simpler. A thorough site inspection, including all building interiors as well as all exterior property and grounds. NASA diagram More recently, microwave power transmission has been demonstrated, in conjunction with solar energy capture, between a mountain top in Maui and the island of Hawaii 92 miles awayby a team under John C. Hoses attached to temporary support legs for the solar panels pushed air underneath hockey pucks on the feet.


Share this book
You might also like
Unwillingly given, ungratefully received

Unwillingly given, ungratefully received

Vultures (Our Wild World (Paperback))

Vultures (Our Wild World (Paperback))

Memoir of the late Thomas Scatcherd

Memoir of the late Thomas Scatcherd

Fixing the news

Fixing the news

Jade

Jade

Canadian library directory: Supplement 1950/51.

Canadian library directory: Supplement 1950/51.

Philips small world atlas.

Philips small world atlas.

LT 2-B Gdr Oh, Columbus! Is

LT 2-B Gdr Oh, Columbus! Is

Eight Animals on the Town

Eight Animals on the Town

Boy on a straight-back chair.

Boy on a straight-back chair.

Natural disaster experiences

Natural disaster experiences

Oriental Asia (Foundations of world regional geography series)

Oriental Asia (Foundations of world regional geography series)

A new look at Christian morality

A new look at Christian morality

Learning from newspapers

Learning from newspapers

Preliminary environmental assessment for the satellite power system book

Uncorrected pre-review manuscript. This often provides the only opportunity for design changes to be made and mitigation measures to be incorporated in the project design. Improved coordination will reduce uncertainty. Checklists, matrices, networks diagrams, graphical comparisons and overlays, are all techniques developed to help carry out an EIA and present the results of an EIA in a format useful for comparing options.

Moriarty, H. Lee, P. Once a satellite is built, it is tested for its ability to sustain the vibrations of launch. There are no clear rules about how to involve the public and it is important that the process remains innovative and flexible.

We deliver our local expertise of geologic and regulatory environments throughout the country. Rock, Stanford University.

Environmental impacts and benefits Santos-Alamillos, F. Some individual parts and each individual instrument from the satellite go through three types of testing: dynamic, electromagnetic compatibility, and thermal vacuum.

It's a great question, because many, many people out there at some point in their professional lives may need to get one, but we find that a lot of folks don't exactly know what they are, especially if you've never refinanced or purchased commercial or industrial property.

The EIA process must be seen to be fair. It covers an investigation of the current and past history and uses of the property in question. Deployment and installation R. Due to this mismatch between the actual funding and program plan, the committee believed it was critical to evaluate the organizational foundations, modeling methodologies, and program management style on which the future SSP investment strategy will be based despite levels of funding available to the program.

Veron, W. Scoping is the process of identifying the key environmental issues and is perhaps the most important step in an EIA. First, so that problems can be pinpointed early allowing mitigating design changes to be made before expensive detailed work is carried out.

Another interesting question we get! Microwave power transmission[ edit ] William C. If the need for monitoring ceases, data collection should cease. The large size of the transmitting and receiving antennas means that the minimum practical power level for an SPS will necessarily be high; small SPS systems will be possible, but uneconomic.This lesson provides students with an understanding of satellites, their use and structure, and power systems.

In this potentially multi-day activity, students will use the engineering design process to design, build, test and improve a model satellite.

The satellite must meet certain. exploited European space power-system knowhow and atlasbowling.com to this unique support from ESA, the car established a new World Record time of 32 hours 39 atlasbowling.com team was led by an ESA astronaut, now Head of the ESA Education Office, Wubbo Ockels.

The European space power-system technologies used to give the ‘Nuna’car its.

Looking for other ways to read this?

Design and Management of Satellite Power Systems Jinkyu Lee, Eugene Kim and Kang G. Shin Dept. of EECS, University of Michigan December 4th, The 34th IEEE Real-Time Systems Symposium.

Earth observation satellite

Region System Manager/Associate Region Engineer-Development and the Environmental Section in the Bureau of Transportation Planning must always receive copies of these minutes. Input actual finish date (PPMS Task No. ) into the appropriate data system.

Preliminary & Phase I & II Environmental Site Assessments (ESA)

Requirements • Old plans and/or a sketch of the proposed typical for the work. iii Page Earth coverage and frequency reuse. 81 Earth coverage by a geostationary satellite.

occupational health professionals, and environmental engineers to identify hazards and mitigate risks through the SE process. It is not the intent of this document to make system safety.